25 March 2013 | News

Les Laures Hydropower, Brissogne (Aosta)

In 2012, the construction of the hydropower plant in Brissogne, near Aosta, was completed. Various companies, including Edilmac, have cooperated in these works, which lasted 6 years. The major difficulty was the vertical well (approx. 580 m in length and 1.32 m in diameter). As always, our company finished the job with flying colours. We recommend watching the video of the construction site on our YouTube channel: www.youtube.com/EmEdilmac

Share