In 2012, the construction of the hydropower plant in Brissogne, near Aosta, was completed. Various companies, including Edilmac, have cooperated in these works, which lasted 6 years. The major difficulty was the vertical well (approx. 580 m in length and 1.32 m in diameter). As always, our company finished the job with flying colours. We recommend watching the video of the construction site on our YouTube channel: www.youtube.com/EmEdilmac